(2011). Uncertainty Reduction of Metering System in Kharg Island Oil Terminal by Adjusting Pipe Line Volume Flow rate. Iranian Journal of Chemical Engineering(IJChE), 8(3), 64-77.
MLA
. "Uncertainty Reduction of Metering System in Kharg Island Oil Terminal by Adjusting Pipe Line Volume Flow rate". Iranian Journal of Chemical Engineering(IJChE), 8, 3, 2011, 64-77.
HARVARD
(2011). 'Uncertainty Reduction of Metering System in Kharg Island Oil Terminal by Adjusting Pipe Line Volume Flow rate', Iranian Journal of Chemical Engineering(IJChE), 8(3), pp. 64-77.
VANCOUVER
Uncertainty Reduction of Metering System in Kharg Island Oil Terminal by Adjusting Pipe Line Volume Flow rate. Iranian Journal of Chemical Engineering(IJChE), 2011; 8(3): 64-77.